RMS Enterprise Scheduling Interface for Exchange v1.1.4

Note: this is an old version. The current version is: RMS Enterprise Scheduling Interface for Exchange v1.2.3. ×

Last Updated: Sep 25

Release Notes
=============

RMS Enterprise Scheduling Interface for Exchange
Current Version: 1.1.4
Release Date: September 2020


Prerequisites
-------------

-- RMS Enterprise Server version 4.7.0 or later.

-- Microsoft Exchange 2013 SP1.

-- Microsoft Exchange 2016.

-- Microsoft Office 365.

-- Azure AD Tenant to create App(for Modern Authentication)

Changes in this release
-----------------------

-- Modern Authentication support using Microsoft Graph for Exchange Online(Microsoft Office 365)

-- On saving RMS server settings, only Exchange Settings tab gets enabled. Synchronization Options tab will be enabled only after saving Exchange Settings.

-- If Exchange Settings are already configured, saving Exchange settings again will re-sync resource profiles from Exchange Server and remove existing mappings from RMS Server.


Known Issues
------------

-- Hybrid Modern Authentication is not supported

-- Streaming Notifications feature is currently not supported with Modern Authentication.

-- Newly added Room Mailbox will take approximately 24 hours to reflect in 'Resource Profiles' tab.

-- Any prerequisite Java version should not be uninstalled, if we are upgrading to v1.1.4
After upgrade, users could uninstall existing Java as v1.1.4 is using bundled JRE.

-- Exchange Configuration Application needs to be closed before uninstallation.

-- Single meetings that start more than 23 months in the future will not be
synchronized into RMS. Also, the occurrences of recurring meetings will
be limited to 23 months into the future even if the recurrence pattern
specifies "No End Date" or has a defined end date that falls beyond 23
months into the future.

-- Changing the attendees of an existing meeting doesn't actually modify the
meeting in Exchange. This is simply how Exchange behaves. As a result,
the meeting will not be resynchronized to RMS and the attendee changes won't
be reflected in RMS. Something such as the subject, body, or date/time must
be changed in order for a synchronization to RMS to occur.

-- Ending or extending a meeting from the touch panel will only update the
resource's calendar. The meeting time will not be adjusted on the
calendars for the organizer and attendees.

-- Exchange Configuration Application needs to be closed to start uninstallation process.


Related Products

  • RMS-SCH-EWS

    RMS-SCH-EWS

    RMS Enterprise Interface for Microsoft Exchange Web Services (EWS)